Del Mar College: Harvin Student Center

Location: Corpus Christi, TX

Project Description: Renovation of 15,000 sf occupied space and construction of a 20,000 sf expansion

Services: Program Management, Construction Management

Project Scope

AG|CM provided Program and Construction Management services for Del Mar College for 29 different projects totaling over $22.9 million. Initially, AG|CM was retained to provide these services for a major capital projects program at both of the College’s campuses that were already undergoing construction under a lack of oversight and management. The group of five projects involved new construction, replacement and expansion totaling $14M and were in various stages of construction and/or design. AG|CM accessed each project, identifying required corrective measures and developing a plan-of-action and milestones for resolution to best meet the College’s requirements.

Subsequently, AG|CM was assigned an additional 24 projects, totaling $8.9M, assisting with planning, budgeting, design, construction and commissioning.

Services Provided

The 15,000-square-foot renovation and 20,000-square-foot expansion construction of the Del Mar College Harvin Student Center required both renovation and new construction work to be completed while the facility was in operation. AG|CM assumed Construction Management control over the expansion project at 30-percent completion, resolved various design and contractual problems and provided oversight and direction through completion and start-up.

Delayed due to weather and contractor problems, the initial expansion was delayed by 6 months. The renovation was completed by AG|CM on schedule.

©2009 AG|CM | Corpus Christi, San Antonio, Austin, TX